CONSTRUCTION MACHINERY & WORKS MANAGEMENT (BTCE-402)

1. INTRODUCTION :Need for project planning & management, time, activity & event, bar
chart, Milestone chart, uses & draw backs.

2. PERT :Construction of PERT network, time estimates, network analysis, forward pass &
backward pass, slack, critical path, data reduction, suitability of PERT for research project,
numerical problems.

3.CPM :Definitions, network construction, critical path, fundamental rules, determination of
project schedule, activity time estimates, float types, their significance in project control,
numerical problems.

4. COST ANALYSIS AND CONTRACT :Type of costs, cost time relationships, cost
slopes, conducting a crash programme, determining the minimum total cost of project,
numerical problems. updating a project, when to update, time grid diagram, resource
scheduling. planning of different components of civil engineering projects such as a house,
workshop, dam, tunnel.

5. CONSTRUCTION EQUIPMENT AND MACHINERY :Tractors, bull dozers, rippers,
scrappers, power shovels, dragline, hoes. Line diagram of each, sizes, output, uses, factors
affecting selection of each equipment, economic life of equipment,maintenance and repair
cost.

Hoisting & Transporting Equipments: Hosts, Winches, Cranes, Belt conveyors, Ropeways,
trucks & Wagons.

6. :Plants for grading, batching, mixing, types of mixers, concrete pumps, bitumen plants.

2 comments:

  1. I feel happiness to read the content that you are posting
    construction company

    ReplyDelete
  2. Substantially, the article is actually the freshest on that deserving topic. I harmonise with your conclusions and can eagerly look forward to your future updates. Saying thanks will not simply be enough, for the exceptional lucidity in your writing. I will certainly directly grab your rss feed to stay privy of any updates. Gratifying work and also much success in your business enterprize! https://westasianetwork.com/cure-seal-hardener.php

    ReplyDelete